Search Result
Gallery Photo
Watershed 1 gage house and weir in background, charred conduit on hillslope in foreground
Gallery Photo
Charred remains of the powerline from the landing to the Watershed 1 gage house.
Gallery Photo
Melted remains of what was a fiberglass pole with a hobo temperature sensor on top, one of the 186 distributed temperature stations across the HJA
Gallery Photo
Looking down into the base of Watershed 1, from the north-facing hillslope
Gallery Photo
Phenology Core Site 1, on the north-facing slope of Watershed 1. Tree tags and dendrometer bands in the background.
Gallery Photo
Melted tree label, intact aluminum tree tag, and dendrometer band. PC01
Gallery Photo
Patchy burns in Phenology Core Site 1 (PC01), Marked VAPA plant was top killed by heat but not burned over
Gallery Photo
Phenology Core Site 1, on the north-facing slope of Watershed 1. Tree tags and dendrometer bands in the background.
Gallery Photo
Phenology Core Site 1, on the north-facing slope of Watershed 1. Tree tags and dendrometer bands in the background.
Gallery Photo
Melted tree label, intact aluminum tree tag, and dendrometer band. PC01
Gallery Photo
Trail in WS1, north-facing slope. Burned area described as having "ash up to the ankles"
Gallery Photo
Watershed 9 gage house with tree fallen on it, steps and footbridge damaged by fire.
Gallery Photo
Tree fallen on top of Watershed 9 gage house. Burned sediment basin in the background, left.
Gallery Photo
Burned slope in Watershed 9, upslope of gagehouse on "river left"
Gallery Photo
Gage house and wier of Watershed 9. Greg Downing clearing ash and debris from flume to prepare for water sample collection.
Gallery Photo
Dangle head processor removes small trees along driveway of headquarters