Did You Know?

Andrews Forest has over 50 galleries that reflect the history, place, people, and research of the HJ Andrews Experimental Forest Long-Term Ecological Research Program.

View Galleries

Image Search

Thumbnail Media name Gallery Keyword Tags Caption Photographed date Sort ascending
aew_055.jpg

Catalina Segura in a riparian canopy gap at McRae Trib East (McTE) that was implemented in 2017 to mimic old-growth canopy gaps that increase light to the streambed and promote aquatic food web resources

aew_054.jpg

Filamentous algae in the stream

aew_053.jpg

Allison Swartz inspecting filamentous algae from the stream bed

aew_052.jpg

Dana Warren in a riparian canopy gap at McRae Trib East (McTE) that was implemented in 2017 to mimic old-growth canopy gaps that increase light to the streambed and promote aquatic food web resources

aew_051.jpg

A riparian canopy gap at McRae Trib East (McTE) that was implemented in 2017 to mimic old-growth canopy gaps that increase light to the streambed and promote aquatic food web resources

aew_007.jpg

Catalina Segura (front) and Allison Swartz (back) work on coils of tubing used to warm the streamwater

aew_050.jpg

Allison Swartz inspecting filamentous algae from the stream bed

aew_037.jpg

Keeley MacNeill records water temperature

aew_036.jpg

Keeley MacNeill and Allison Swartz measure temperature at the outflow of the tubes that were heating in the sun

aew_035.jpg

the outflow of the tubes that are delivering diverted water and warmed water from upstream

aew_034.jpg

Dana Warren takes a break from installing and inspecting tubing in the streambed

Drought Experiment 2021 aew_033.jpg Stream Ecology

Melissa Mauk, Keeley MacNeill, Allison Swartz, Dana Warren, Catalina Segura

Drought Experiment 2021 aew_032.jpg Stream Ecology

Melissa Mauk, Keeley MacNeill, Allison Swartz, Dana Warren, Catalina Segura

aew_031.jpg

Melissa Mauk, Catalina Segura, Dana Warren, Keeley MacNeill, Allison Swartz

aew_030.jpg

A red-legged frog (Rana aurora)

aew_029.jpg

A red-legged frog (Rana aurora)

aew_028.jpg

A red-legged frog (Rana aurora)

aew_038.jpg

Allison Swartz measures stream temperature from coils of tubing for the warming experiment

aew_039.jpg

Stream temperature and specific conductivity meter used to measure warming from coils of tubing for the warming experiment and travel time through the tubing

aew_049.jpg

Inspecting filamentous algae on the stream bed that only grows in high light conditions

aew_048.jpg

At McRae Tributary East, Dana Warren and crew inspect a riparian area where trees were removed in 2017 to increase the amount of sunlight to the streambed

aew_047.jpg

At McRae Tributary East, Dana Warren and crew inspect a riparian area where trees were removed in 2017 to increase the amount of sunlight to the streambed

aew_046.jpg

Large tubing was used to divert water from upstream; small tubing was used to divert and warm water from upstream

aew_045.jpg Stream Ecology

Keeley MacNeill and Allison Swartz measure temperature at the outflow of the tubes that were heating in the sun

aew_044.jpg

Field crew for the pilot test of the dewatering experiment July 2021

aew_043.jpg

Allison Swartz measures stream temperature from coils of tubing for the warming experiment

aew_042.jpg

Allison Swartz measures stream temperaturefrom coils of tubing for the warming experiment

aew_041.jpg

Keeley MacNeill recording stream temperature data

aew_040.jpg

Allison Swartz measures stream temperature from coils of tubing for the warming experiment

aew_027.jpg

A red-legged frog (Rana aurora)

aew_021.jpg

Large tubing was used to divert water from upstream; small tubing was used to divert and warm water from upstream

aew_014.jpg

A large tube is used to divert water, bypassing a section of the stream to create drought conditions

aew_015.jpg

Keeley MacNeill and undergraduate student Melissa Mauk

aew_026.jpg

Dana Warren and Melissa Mauk Check that the large tube is delivering water

aew_025.jpg

Catalina Segura and Allison Swartz manage the many coils and meters of tubing and hoses

aew_024.jpg

hoses and fittings

aew_023.jpg

coils of tubing in the sun warm the stream water

aew_022.jpg

Undergraduate student Melissa Mauk works on managing the tubing for the experiment

aew_017.jpg

Dana Warren inspects the outflow of the tubes that are delivering diverted water and warmed water from upstream

aew_020.jpg

Large tubing was used to divert water from upstream; small tubing was used to divert and warm water from upstream

aew_019.jpg

Large tubing was used to divert water from upstream; small tubing was used to divert and warm water from upstream

aew_013.jpg Stream Ecology

A large tube is used to divert water, bypassing a section of the stream to create drought conditions

aew_011.jpg

A large tube is used to divert water, bypassing a section of the stream to create drought conditions

aew_010.jpg

A large tube is used to divert water, bypassing a section of the stream to create drought conditions

aew_016.jpg

Dana Warren in the with the large tubing used to divert water past a reach of the stream

aew_018.jpg

the outflow of the tubes that are delivering diverted water and warmed water from upstream

aew_012.jpg

A large tube is used to divert water, bypassing a section of the stream to create drought conditions

aew_008.jpg

Allison Swartz and the coils of tubing for the warming experiment

aew_009.jpg

Dana Warren in the streambed

Sunrise in the old-growth afq_016.JPEG

Sunrise at a bird survey point near Saddle Creek

Black bear tracks in the spring snowpack afq_015.JPEG

Black bear tracks in the spring snowpack near UPLMET station.

Lookout Fog afq_013.JPEG

Firs and Usnea in the morning fog on Lookout Mountain

Snags in the fog afq_012.JPEG

Snags in the morning fog on Lookout Mountain Trail.

Mountain lion tracks in the spring snowpack afq_011.JPEG

Mountain lion tracks in the spring snowpack near Carpenter Mountain

Bird's nest fungus afq_010.JPEG

Bird's nest fungus on decaying branch.

Early spring fog afq_009.JPEG

Fog and frozen alder twigs near Carpenter Mountain

Early spring snow afq_008.JPEG

Spring snowpack near Carpenter Mountain.

Watershed 2 Post Fire October 2020 aev_048.jpg

Completed repair of dozer line along 1507 road. Soils, branches and tree boles pushed out of way by dozer were pulled back onto line by an excavator.

Watershed 2 Post Fire October 2020 aev_047.jpg

Repair work with heavy equipment on dozer line on 1507 road

Watershed 2 Post Fire October 2020 aev_046.jpg

Smoke and evidence of browned tree crowns on the slope of Watershed 2

Watershed 2 Post Fire October 2020 aev_045.jpg

Smoke and evidence of browned tree crowns on the slope of Watershed 2

Watershed 2 Post Fire October 2020 aev_044.jpg

Smoke and evidence of browned tree crowns on the slope of Watershed 2

Watershed 2 Post Fire October 2020 aev_042.jpg

Air Crane drops water over hot spots in Watershed 2. Taken from top of USGS Debris Flume.

Watershed 2 Post Fire October 2020 aev_043.jpg

Night time image of hot spot of fire in Watershed 2

Watershed 2 Post Fire October 2020 aev_007.jpg

Fire hand line and hose on a slope of WS2

Watershed 2 Post Fire October 2020 aev_008.jpg

Fire hand line and hose on a slope of WS2

Watershed 2 Post Fire October 2020 aev_009.jpg

USFS Resource Advisor flags watershed 2 trail crossing along the handline in WS2

Watershed 2 Post Fire October 2020 aev_011.jpg

USFS staff survey along the handline in WS2

Watershed 2 Post Fire October 2020 aev_010.jpg

Fire hand line and hose on a slope of WS2

Watershed 2 Post Fire October 2020 aev_012.jpg

Fire hand line and hose on a slope of WS2

Watershed 2 Post Fire October 2020 aev_013.jpg

USFS staff survey along the handline in WS2

Watershed 2 Post Fire October 2020 aev_015.jpg

USFS Resource Advisor surveys along the handline in WS2. PVC post marking vegetation plot in background

Watershed 2 Post Fire October 2020 aev_016.jpg

USFS staff survey along the handline in WS2. Note the tags on the nearby trees, indicating that the fire line went through one of the vegetation plots, used since the 1950s to track plant growth and mortality.

Watershed 2 Post Fire October 2020 aev_017.jpg

Fire hand line and hose on a slope of WS2

Watershed 2 Post Fire October 2020 aev_014.jpg

USFS staff survey along the handline in WS2. Note the tags on the nearby trees, indicating that the fire line went through one of the vegetation plots, used since the 1950s to track plant growth and mortality.

Watershed 2 Post Fire October 2020 aev_018.jpg

Fire hand line and hose on a slope of WS2. Snags and other hazardous trees were cut along handline.

Watershed 2 Post Fire October 2020 aev_019.jpg

Fire hand line and hose on a slope of WS2

Watershed 2 Post Fire October 2020 aev_035.jpg

Smoke from hotspot in WS2 above gaging, taken from handline

Watershed 2 Post Fire October 2020 aev_034.jpg

Fire hand line and hose on a slope of WS2. USFS Resource Advisors.

Watershed 2 Post Fire October 2020 aev_033.jpg

Returning downslope along dozer line from road 465 along ridge bounding WS2 and WS3. USFS Resource Advisors.

Watershed 2 Post Fire October 2020 aev_032.jpg

Active fire in the upper portion of WS2 just below upper trail, low severity ground fire

Watershed 2 Post Fire October 2020 aev_031.jpg

Active fire in the upper portion of WS2 just below upper trail, low severity ground fire. A few hours after photo taken the fire reached the trail, but was held in check by crews using fire hose supplied by frequent trips from tender trucks.

Watershed 2 Post Fire October 2020 aev_029.jpg

Fire dozer line in Watershed 2, where it meets the 465 Road

Watershed 2 Post Fire October 2020 aev_027.jpg

Fire dozer line in Watershed 2. Large snag in left foreground was cut for safety.

Watershed 2 Post Fire October 2020 aev_026.jpg

Fire dozer line in Watershed 2

Watershed 2 Post Fire October 2020 aev_025.jpg

Fire dozer line in Watershed 2

Watershed 2 Post Fire October 2020 aev_023.jpg

Fire dozer line in Watershed 2. Root wad and upturned soil in foreground on right from tree pushed over by dozer

Watershed 2 Post Fire October 2020 aev_022.jpg

Fire dozer line in Watershed 2. Disturbance to soil and vegetation is much more significant along dozer line than handline, but it also makes a more effective fire break.

Watershed 2 Post Fire October 2020 aev_021.jpg

Fire dozer line in Watershed 2 near road 455.

Watershed 2 Post Fire October 2020 aev_020.jpg

Fire dozer line in just above 455 road at edge of Watershed 2. Dozer line runs from 465 to 455 roads, at which point even steeper terrain forced crews to use handline the rest of the way downslope to road 302

Watershed 2 Post Fire October 2020 aev_030.jpg

Fire hand line in the upper area of Watershed 2 follows the upper watershed 2 trail for ca. 1/4 mile. Then handline cuts upslope to connect with a dozer line off of road 2633.

Watershed 2 Post Fire October 2020 aev_036.jpg

Fire hand line and hose on a slope of WS2. USFS Resource Advisors.

Watershed 2 Post Fire October 2020 aev_006.jpg

Fire hand line and hose on a slope of WS2

This was an accidental beginning of the dozer line at junction with 465 road. Operator likely mistook this for the main side ridge. After opening ca. 60 feet the dozer backtracked and began the actual fire line running down side ridge to road 455. aev_028.jpg

This was an accidental beginning of the dozer line at junction with 465 road. Operator likely mistook this for the main side ridge. After opening ca. 60 feet the dozer backtracked and began the actual fire line running down side ridge to road 455.

Watershed 2 Post Fire October 2020 aev_024.jpg

Fire dozer line in Watershed 2. This particularly steep section would be vulnerable to serious erosion without subsequent waterbarring and repair work.

Watershed 2 Post Fire October 2020 aev_041.jpg

smoke on the landscape, from fire in Watershed 2

Watershed 2 Post Fire October 2020 aev_040.jpg

smoke on the landscape, from fire in Watershed 2

Watershed 2 Post Fire October 2020 aev_039.jpg

smoke on the landscape, from fire in Watershed 2. Taken from 130 road radio tower

Watershed 2 Post Fire October 2020 aev_038.jpg

Air Crane used for water drops over hot spots in Watershed 2

Watershed 2 Post Fire October 2020 aev_037.jpg

Air Crane used for water drops over hot spots in Watershed 2

Watershed 2 Post Fire October 2020 aev_001.jpg

Watershed 2 gage house and sediment basin, with firehose in the foreground

Watershed 2 Post Fire October 2020 aev_002.jpg

Watershed 2 gage house with fire hose going up the slope toward the active fire area

Watershed 2 Post Fire October 2020 aev_003.jpg

Fire hand line and fire hose moving up the slope in WS2, from the 302 Road. USFS Resource Advisors in foreground.

Watershed 2 Post Fire October 2020 aev_004.jpg

Fire hand line and fire hose traversing up slope in WS2, from the 302 Road.

Watershed 2 Post Fire October 2020 aev_005.jpg

Snags create concerns for the safety of fire crews working the area

Holiday Farm Fire 2020 aeu_111.jpg

Panorama of Blue River Valley

Holiday Farm Fire 2020 aeu_112.jpg

Looking down into the Andrews Forest from the 130 road where smoke rises from Watershed 2

Holiday Farm Fire 2020 aeu_114.jpg

Hand line cut along the entrance driveway to headquarters

Holiday Farm Fire 2020 aeu_115.jpg

Hand line cut along the entrance driveway to headquarters

Holiday Farm Fire 2020 aeu_113.jpg

Panorama from the 130 road, looking into the Lookout Creek watershed where smoke rises from Watershed 2

Holiday Farm Fire 2020 aeu_116.jpg

Hand line and cut trees behind the office building at headquarters

Holiday Farm Fire 2020 aeu_110.jpg

Looking down the Lookout and Blue River Valleys, with areas of dead trees and smoke on the Mona side

Holiday Farm Fire 2020 aeu_109.jpg

Smoke from hot spots of fire in Watershed 2

Holiday Farm Fire 2020 aeu_108.jpg

Smoke from hot spots of fire in Watershed 2

Holiday Farm Fire 2020 aeu_119.jpg

PRIMET climate station in foreground, smoke rising from old growth stand in between WS1 and WS2 in background

Holiday Farm Fire 2020 aeu_107.jpg

Smoke from hot spots of fire in Watershed 2

Holiday Farm Fire 2020 aeu_120.jpg

PRIMET climate station in foreground, smoke rising from old growth stand in between WS1 and WS2 in background

Holiday Farm Fire 2020 aeu_121.jpg

An Air-Crane Helicoptor, 3AC, dumps water over hot spots in Watershed 2. Photo taken from PRIMET at headquarters.

Holiday Farm Fire 2020 aeu_122.jpg

An Air-Crane Helicoptor, 3AC, dumps water over hot spots in Watershed 2, PRIMET in foreground

Holiday Farm Fire 2020 aeu_118.jpg

Panorama of dozer line around headquarters and the PRIMET climate station

Holiday Farm Fire 2020 aeu_117.jpg

Dozer line around headquarters and the PRIMET climate station

Holiday Farm Fire 2020 aeu_091.jpg

small branches piles, as part of fire line cutting, along driveway of headquarters

Holiday Farm Fire 2020 aeu_105.jpg

Area of high severity fire, along the 15 road (outside of the Andrews Forest), close to the junction with HWY126

Holiday Farm Fire 2020 aeu_100.jpg

Electric utility box along the 15 Road between highway 126 and the saddle dam. Power was lost along the 15 road and HWY126.

Holiday Farm Fire 2020 aeu_101.jpg

Area of high severity fire, along the 15 road (outside of the Andrews Forest), close to the junction with HWY126. This area of USFS land was thinned with underburning ca. five years earlier

Holiday Farm Fire 2020 aeu_102.jpg

Area of high severity fire, along the 15 road (outside of the Andrews Forest), close to the junction with HWY126

Holiday Farm Fire 2020 aeu_084.jpg

Fire crew cuts fire line around headquarters, just behind assembly area

Holiday Farm Fire 2020 aeu_103.jpg

Area of high severity fire, along the 15 road (outside of the Andrews Forest), close to the junction with HWY126

Holiday Farm Fire 2020 aeu_082.jpg

Dangle head processor removes small trees along driveway of headquarters

Holiday Farm Fire 2020 aeu_081.jpg

Burned footbridge, railing, and sediment basin of Watershed 9

Holiday Farm Fire 2020 aeu_080.jpg

Gage house and wier of Watershed 9. Greg Downing clearing ash and debris from flume to prepare for water sample collection.

Holiday Farm Fire 2020 aeu_079.jpg

Burned slope in Watershed 9, upslope of gagehouse on "river left"

Holiday Farm Fire 2020 aeu_078.jpg

Tree fallen on top of Watershed 9 gage house. Burned sediment basin in the background, left.

Holiday Farm Fire 2020 aeu_077.jpg

Tree fallen on top of Watershed 9 gage house

Holiday Farm Fire 2020 aeu_085.jpg

Fire line behind apartment buildings at the headquarters

Holiday Farm Fire 2020 aeu_071.jpg

Phenology Core Site 1, on the north-facing slope of Watershed 1. Tree tags and dendrometer bands in the background.

Holiday Farm Fire 2020 aeu_090.jpg

Fire line along driveway of headquarters

Holiday Farm Fire 2020 aeu_092.jpg

Firehawk helicoptor over Watershed 2

Holiday Farm Fire 2020 aeu_093.jpg

Smoke from hot spots of fire in Watershed 2

Holiday Farm Fire 2020 aeu_089.jpg

Fire line around PRIMET station

Holiday Farm Fire 2020 aeu_095.jpg

Smoke from hot spots of fire in Watershed 2

Holiday Farm Fire 2020 aeu_096.jpg

Firehawk helicoptor drops water over hot spots in Watershed 2

Holiday Farm Fire 2020 aeu_097.jpg

Firehawk helicoptor drops water over hot spots in Watershed 2

Holiday Farm Fire 2020 aeu_098.jpg

Looking over the Blue River Reservoir to patchy burn in the Mona area, from the 15 Road at site of 2011 landslide.

Holiday Farm Fire 2020 aeu_099.jpg

Looking west over the Blue River dam, at areas that had high severity fire

Holiday Farm Fire 2020 aeu_088.jpg

Dozer line around PRIMET climate station

Holiday Farm Fire 2020 aeu_087.jpg

Small trees cut and dozer line around PRIMET climate station

Holiday Farm Fire 2020 aeu_086.jpg

Fire crews cut hand line along driveway at headquarters

Holiday Farm Fire 2020 aeu_083.jpg

Fire hose and sprinklers set up around headquarters

Holiday Farm Fire 2020 aeu_076.jpg

Tree fallen on top of Watershed 9 gage house