Search Result
Gallery Photo
Phenology Core Site 1, on the north-facing slope of Watershed 1. Tree tags and dendrometer bands in the background.
Gallery Photo
Melted tree label, intact aluminum tree tag, and dendrometer band. PC01
Gallery Photo
Patchy burns in Phenology Core Site 1 (PC01), Marked VAPA plant was top killed by heat but not burned over
Gallery Photo
Phenology Core Site 1, on the north-facing slope of Watershed 1. Tree tags and dendrometer bands in the background.
Gallery Photo
Phenology Core Site 1, on the north-facing slope of Watershed 1. Tree tags and dendrometer bands in the background.
Gallery Photo
Melted tree label, intact aluminum tree tag, and dendrometer band. PC01
Gallery Photo
Trail in WS1, north-facing slope. Burned area described as having "ash up to the ankles"
Gallery Photo
Watershed 9 gage house with tree fallen on it, steps and footbridge damaged by fire.
Gallery Photo
Tree fallen on top of Watershed 9 gage house. Burned sediment basin in the background, left.
Gallery Photo
Burned slope in Watershed 9, upslope of gagehouse on "river left"
Gallery Photo
Gage house and wier of Watershed 9. Greg Downing clearing ash and debris from flume to prepare for water sample collection.
Gallery Photo
Dangle head processor removes small trees along driveway of headquarters
Gallery Photo
Fire crew cuts fire line around headquarters, just behind assembly area
