TABLES

  • Current Monitoring Sites: Met Stations
  • Current Monitoring Sites: Stream Stations
  • Current Streamflow Gaging Stations
  • Current Temperature Stations
  • Current Precipitation Stations
  • Other Meteorological Variables Currently Measured
  • Proposed Variables for Measurement
  • Table 1. Current Monitoring Sites: Meteorological Stations, 1995

    
    Site Name		 	 Tier	Elev   Aspect	Slope Exposure	Site Description
    				   	 (m)   (deg)	(deg)	 
    ______________________________________________________________________________________________
    Central Met Station	        1	1020			O	Clearcut (station under construction)
    Primary Met Station 		1	 435   	 -  	  0	O	Maintained clearing   
    Upper Lookout Met Statn		1				O	Clearcut
    Vanilla Leaf Met Station	1	 1265	180	 	O	Clearcut 1985
    ----------------------------------------------------------------------------------------------------------------------------------------
    Hi-15 Met Station     	 	2	925	240	150	O	2nd growth opening                                                              
    WS#2 Climatic Station 		2	 465	355	  5	O	Old growth opening, tight canopy
    Mack Creek Gaging Station	2	 760	  5	  5	O	Clearcut 1965
    ----------------------------------------------------------------------------------------------------------------------------------------
    Reference Stand #1	        3	 490	200	 41	C	Midslope, near Blue R resevoir
    Reference Stand #2	      	3	 490	285	 22	C	Near valley bottom
    Reference Stand #3 		3	 945	315	  5	C	Midslope
    Reference Stand #4	      	3	1310	270	 27	C	Midslope
    Reference Stand #5 	  	3	 880	 10	 12	C	Midslope, Lookout Ridge 
    Reference Stand #7	        3	 460	  1	 19	C	On slope, near valley bottom Lookout Cr      
    Reference Stand #10	      	3	 610	170	  6	C	Midslope on bench    
    Reference Stand #12  	        3	1010	282	 11	C	On slope, near bottom Upper Lookout Cr
    Reference Stand #13  	    	3	1355	270	 20	C	Midslope, Wildcat Mtn RNA 
    Reference Stand #13 Open        3	1355	270	 20	O	Midslope, Wildcat Mtn RNA 
    Reference Stand #14    		3	1430	  1	 32	C	Midslope, Wildcat Mtn RNA
    Reference Stand #15	      	3	 760	350	 33	C	Midslope moist site WS 2
    Reference Stand #16		3	 640	202	 29	C	Midslope dry site WS 2
    Reference Stand #17		3	 490	315	 14	C	Near valley bottom 
    Reference Stand #20  	 	3	 685	180		C	Midslope
    Reference Stand #24	 	3      	 650	 30	 28	C	Midslope, 100 yr forest, Hagan Block RNA
    Reference Stand #26	 	3	1040	180	 20	C	Midslope WS#8,100yr forest,replaces RS11
    Thermograph Site #38	        3	 978	170		O	Midslope WS#6, overgrown young stand
    Reference Stand #86	      	3	 630	215	 28	O	Midslope WS#10,overgrown young stand,RS6
    Reference Stand #89      	3	 450	315	 37	O	WS#10, overgrown young stand, was RS9
    Mack Creek upstream             2	 756	310		C	Old-growth overstory
    Mack Creek PVC Gage	        3	 760	 75	 10	O	Clearcut                                                                        
    Roads End			3	1325	300	 45	O	Clearcut   
    Trails End          	 	3	1030	285	 17	O	Edge of clearcut
    Wildcat Mountain  	        3	1340	220	 15	O	Meadow
    WS#10 bottom	                3	 445	130	 40	O	Near Gaging Station
    ______________________________________________________________________________________________
    Exposure: O=Open Canopy, C=Closed canopy
    
    

    Table 2. Current Monitoring Sites: Stream Stations, 1995

    Site Name			  Tier	Elev   Aspect	Slope Exposure Drainage Site Description
    				         (m)    (deg)	(deg)	       (acres) 
    ______________________________________________________________________________________________
    Lookout Cr Gaging Station	1	 430				15,400	
    Mack Creek Gaging Station	1	 760	  5	  5	O	1436	Clearcut 1965?
    WS#1 Gaging Station	 	1	 455				237	Clearcut 1967
    WS#2 Gaging Station	 	1	 550				149	Old-growth forest
    WS#3 Gaging Station 		1	 420				250	Old-growth forest
    WS#6 Gaging Station	    	1	 895				32	Edge of clearcut
    WS#7 Gaging Station	    	1	 940				38		 
    WS#8 Gaging Station    		1	 995				53	Old-growth
    WS#9 Gaging Station       	1	 430	340	 40		21	Edge of forest
    WS#10 Gaging Station		1	 475	130	 40		25	Edge of clearcut
    ----------------------------------------------------------------------------------------------------------------------------------------
    McRae Creek			2	 830	220		C		Old-growth overstory, partly open 
    Upper Lookout Creek	 	2	 975	330		C		Old-growth overstory
    Mack-Lookout			2	 655					At confluence (planned)
    McRae-Lookout			2	 550					At confluence (planned)
    ______________________________________________________________________________________________
    
    Exposure: O=Open Canopy, C=Closed canopy
    
    
    
    

    Table 3. Current Streamflow Gaging Stations, 1995

    
    STREAMFLOW
    
    Site Name		 	Tier	 Begin	  Finest      Drainage	Method	Comments
    					 Daily	Resolution     (acres)		 
    					(mm/yy)	(mm/yy)
    ______________________________________________________________________________________________
    Lookout Cr Gaging Station	1	 10/49	Peaks		15,400	USGS	Maintained by USGS	
    Mack Creek Gaging Station	1	 10/79	15 Minute	1,436	CR10	Chart backup   
    WS#1 Gaging Station 		1	 10/52	15 Minute	237	Chart	
    WS#2 Gaging Station		1	 10/52	15 Minute	149	CR10	Chart backup   
    WS#3 Gaging Station 		1	 10/52	15 Minute	250	Chart	
    WS#6 Gaging Station	    	1	 10/63	15 Minute	32	Chart	
    WS#7 Gaging Station	    	1	 10/63	15 Minute	38	Chart	Discontinued 1987-1994
    WS#8 Gaging Station    		1	 10/63	15 Minute	53	Chart	
    WS#9 Gaging Station       	1	 10/68	15 Minute	21	Chart	
    WS#10 Gaging Station		1	 10/68	15 Minute	25	Chart	
    ______________________________________________________________________________________________
    
    
    
    

    Table 4. Current Temperature Stations, 1995

    
    AIR TEMPERATURE
      
    Site Name		 	Tier	  Begin	 Begin	   Finest	Method	Comments
    					  Daily	Fine Res  Resolution	 
    					(mm/yy)	(mm/yy)
    ______________________________________________________________________________________________
    Central Met Station		1	   NA	   NA	     NA		CR10	Planned installation for summer, 1995
    Primary Met Station 		1	  5/72	  5/72	  15 minute	CR21X	Hourly data until 1994, 250,350,450 cm added
    Upper Lookout Met Statn		1	 10/94	 10/94	  15 minute	CR10	Data at 4 heights:150,250,350,450 cm
    Vanilla Leaf Met Station	1	  6/87	 10/90	  15 minute	CR21X	Data at 5 heights:50,150,250,350,450 cm
    -----------------------------------------------------------------------------------------------------------------------------------------
    Hi-15 Met Station      		2	  3/92	  3/92	  Hourly	CR10	Sensors at 150, 450
    WS#2 Climatic Station 		2	  2/58	  	  Daily		Chart	Max-min only, longest HJA record
    Mack Creek Gaging Station	2	  8/87	 12/94	  Hourly	CR10	Sensor relocated over stream in 1993
    -----------------------------------------------------------------------------------------------------------------------------------------
    Reference Stand #1	        3	  4/70		  Day/night	Chart	Scheduled for termination
    Reference Stand #2      	3	  5/70		  Day/night	CR10	CR10 installed summer,1987
    Reference Stand #3      	3	  4/70		  Day/night	Chart	Scheduled for termination
    Reference Stand #4      	3	  6/70		  Day/night	CR10	CR10 installed summer,1987
    Reference Stand #5      	3	  5/71		  Day/night	Chart	CR10 planned
    Reference Stand #7      	3	  5/70		  Day/night	Chart	Scheduled for termination
    Reference Stand #10	        3	  4/71		  Day/night	Chart	CR10 planned
    Reference Stand #12  	    	3	  7/71		  Day/night	CR10	CR10 installed summer,1987
    Reference Stand #13  	    	3	  8/71		  Day/night	CR10	CR10 installed summer,1987
    Reference Stand #13 Open    	3	  8/87		  Day/night	CR10	Adjacent meadow to RS13
    Reference Stand #14  	    	3	  8/71		  Day/night	CR10	CR10 installed summer,1987
    Reference Stand #15	        3	  7/72		  Day/night	Chart	Scheduled for termination
    Reference Stand #16	        3	  7/72		  Day/night	Chart	Scheduled for termination
    Reference Stand #17	        3	  6/72		  Day/night	Chart	Scheduled for termination
    Reference Stand #20  	    	3	  1/79		  Day/night	CR10	CR10 installed summer,1987
    Reference Stand #24  	    	3	  6/77		  Day/night	CR10	CR10 installed summer,1988
    Reference Stand #26  	    	3	  1/78		  Day/night	CR10	CR10 installed summer,1987
    Thermograph Site #38	 	3	  6/75		  Day/night	Chart	CR10 planned
    Reference Stand #86	      	3	  9/75		  Day/night	Chart	CR10 planned
    Reference Stand #89 	     	3	  9/75		  Day/night	Chart	CR10 planned
    Mack Creek upstream 		3	  8/76		  Day/night	Chart	Scheduled for termination
    McRae Creek			2	  8/76		  Day/night	Chart	CR10 planned
    Upper Lookout Creek	 	2	  1/77		  Day/night	Chart	CR10 planned
    Lookout Cr Gaging Station	2	  3/95	  3/95	  Hourly	CR10	Daily by USGS 1964-1981
    Mack-Lookout			2	   NA	   NA	    NA		CR10	Planned installation for summer, 1995
    McRae-Lookout			2	   NA	   NA	    NA		CR10	Planned installation for summer, 1995
    ______________________________________________________________________________________________
    
    
    
    DEW POINT TEMPERATURE
      
    Site Name		 	Tier	  Begin	  Begin	   Finest	Method	Comments
    					  Daily	Fine Res Resolution	 
    					(mm/yy)	(mm/yy)
    ______________________________________________________________________________________________
    Central Met Station		1	   NA	   NA	    NA		CR10	Planned installation for summer, 1995
    Primary Met Station 		1	  5/72	  5/72	  Hourly	CR21X	Calculated after 1987, every 15 sec
    Upper Lookout Met Statn		1	 10/94	 10/94	  Hourly	CR10	Calculated from temperature, RH
    Vanilla Leaf Met Station	1	  8/93	  8/93	  Hourly	CR21X	Calculated from temperature, RH
    -----------------------------------------------------------------------------------------------------------------------------------------
    Hi-15 Met Station      		2	  3/92	  3/92	  Hourly	CR10	Calculated from temperature, RH
    ______________________________________________________________________________________________
    
    
    
    SOIL TEMPERATURE
      
    Site Name		 	Tier	  Begin	 Begin	  Finest	Method	Comments
    					  Daily	Fine Res Resolution	 
    					(mm/yy)	(mm/yy)
    ______________________________________________________________________________________________
    Central Met Station		1	   NA	   NA	   NA		CR10	Planned installation for summer, 1995
    Primary Met Station 		1	  7/88	  7/88	  Hourly	CR21X	20 cm depth, 10,50,100 added 11/94
    Upper Lookout Met Station	1	 10/94	 10/94	  Hourly	CR10	Data at 10,20,50,100 cm depths
    Vanilla Leaf Met Station	1	  6/87	 10/90	  Hourly	CR21X	10,20,30 cm depth, 10,20,50,100 after 10/94
    -----------------------------------------------------------------------------------------------------------------------------------------
    Reference Stand #1	        3	  4/70		  Day/night	Chart	Scheduled for termination, 20 cm depth
    Reference Stand #2      	3	  5/70		  Day/night	CR10	CR10 installed summer,1987; 10,20,30 cm
    Reference Stand #3      	3	  4/70		  Day/night	Chart	Scheduled for termination, 20 cm depth
    Reference Stand #4      	3	  6/70		  Day/night	CR10	CR10 installed summer,1987; 10,20,30 cm
    Reference Stand #5      	3	  5/71		  Day/night	Chart	CR10 planned, 20 cm depth
    Reference Stand #7      	3	  5/70		  Day/night	Chart	Scheduled for termination, 20 cm depth
    Reference Stand #10	      	3	  4/71		  Day/night	Chart	CR10 planned, 20 cm depth
    Reference Stand #12  	    	3	  7/71		  Day/night	CR10	CR10 installed summer,1987; 10,20,30 cm
    Reference Stand #13  	    	3	  8/71		  Day/night	CR10	CR10 installed summer,1987; 10,20,30 cm
    Reference Stand #13 Open	3	  8/87		  Day/night	CR10	Adjacent meadow to RS13
    Reference Stand #14  	    	3	  8/71		  Day/night	CR10	CR10 installed summer,1987; 10,20,30 cm
    Reference Stand #15	        3	  7/72		  Day/night	Chart	Scheduled for termination, 20 cm depth
    Reference Stand #16	        3	  7/72		  Day/night	Chart	Scheduled for termination, 20 cm depth
    Reference Stand #17	        3	  6/72		  Day/night	Chart	Scheduled for termination, 20 cm depth
    Reference Stand #20  	    	3	  1/79		  Day/night	CR10	CR10 installed summer,1987; 10,20,30 cm
    Reference Stand #24  	    	3	  6/77	 	  Day/night	CR10	CR10 installed summer,1988; 10,20,30 cm
    Reference Stand #26  	    	3	  1/78		  Day/night	CR10	CR10 installed summer,1987; 10,20,30 cm
    Thermograph Site #38	 	3	  6/75		  Day/night	Chart	CR10 planned, 20 cm depth
    Reference Stand #86	      	3	  9/75		  Day/night	Chart	CR10 planned, 20 cm depth
    Reference Stand #89 	     	3	  9/75		  Day/night	Chart	CR10 planned, 20 cm depth
    ______________________________________________________________________________________________
    
    
    
    STREAM TEMPERATURE 
      
    Site Name		 	Tier	  Begin	  Begin	  Finest	Method	Comments
    					  Daily	Fine Res Resolution	 
    					(mm/yy)	(mm/yy)
    ______________________________________________________________________________________________
    Mack Creek Gaging Station	1	  8/87	 12/94	  Hourly	CR10	
    -----------------------------------------------------------------------------------------------------------------------------------------
    McRae Creek			2	  8/76	  3/95	  Hourly	CR10	CR10 installed 3/95
    Upper Lookout Creek	 	2	  1/77	  3/95	  Hourly	CR10	CR10 installed 3/95
    Lookout Cr Gaging Station	2	  3/95	  3/95	  Hourly	CR10	Daily by USGS 1964-1981
    Mack-Lookout			2	   NA	   NA	   NA		CR10	Planned installation for summer, 1995
    McRae-Lookout			2	   NA	   NA	   NA		CR10	Planned installation for summer, 1995
    ______________________________________________________________________________________________
    
    
    
    
    
    
    

    Table 5. Current Precipitation Stations, 1995

    
    PRECIPITATION
      
    Site Name		 	Tier	  Begin	  Begin	  Finest	Method	Comments
    					  Daily	Fine Res  Resolution	 
    					(mm/yy)	(mm/yy)
    ______________________________________________________________________________________________
    Central Met Station		1	   NA	   NA	     NA		CR10	Planned installation for summer, 1995
    Primary Met Station 		1	  1/79	  3/79	  5 Minute	CR21X	Hourly until 10/94
    Upper Lookout Met Statn		1	 10/94	 10/94	  5 Minute	CR10	
    Vanilla Leaf Met Station	1	  6/87	 10/90	  5 Minute	CR21X	Hourly until 10/94
    -----------------------------------------------------------------------------------------------------------------------------------------
    Hi-15 Met Station		2	 10/63	 10/84	  5 minute	CR10	CR10 installed 3/92
    Mack Creek Gaging Station	2	 10/78	 10/84	  5 minute	Chart	CR10 planned
    WS#2 Climatic Station		2	 10/57	 10/57	  5 minute	Chart	Digitized record
    -----------------------------------------------------------------------------------------------------------------------------------------
    Mack Creek PVC Gage		3	  5/79		  Daily		Prorate	Collected monthly
    Roads End Storage Gage		3	 12/78		  Daily		Prorate	Collected monthly
    Trails End PVC Gage		3	 12/78		  Daily		Prorate	Collected monthly
    NADP Universal 			3	  5/80		  Daily		Chart	NADP study gage, PRIMET backup
    WS#10 bottom			3	 10/70		  Daily		Prorate	Collected monthly
    Wildcat Mountain		3	  7/80		  Daily		Prorate	Collected monthly
    ______________________________________________________________________________________________
    
    
    
    SNOW LYSIMETER 
      
    Site Name		 	Tier	  Begin	  Begin	  Finest	Method	Comments
    					  Daily	Fine Res  Resolution	 
    					 (mm/yy) (mm/yy)
    ______________________________________________________________________________________________
    Central Met Station		1	   NA	   NA	     NA		CR10	Planned installation for summer, 1995
    Upper Lookout Met Statn		1	 10/94	 10/94	  5 Minute	CR10	
    Vanilla Leaf Met Station	1	   NA	   NA	     NA		CR21X	Planned installation for summer, 1996
    -----------------------------------------------------------------------------------------------------------------------------------------
    Hi-15 Met Station		1	 10/90	  3/92	  5 Minute	CR10 
    ______________________________________________________________________________________________
    
    
    SNOW MOISTURE
      
    Site Name		 	Tier	  Begin	  Begin	  Finest	Method	Comments
    					  Daily	Fine Res  Resolution	 
    					(mm/yy)	(mm/yy)
    ______________________________________________________________________________________________
    Central Met Station		1	   NA	   NA	   NA		CR10	Planned installation for summer, 1995
    Primary Met Station		1	   NA	   NA	   NA		CR10	Possible installation for summer, 1996
    Upper Lookout Met Statn		1	 10/94	 10/94	  5 Minute	CR10	
    Vanilla Leaf Met Station	1	  6/87	 10/90	  5 Minute	CR21X	Hourly until 10/94
    ---------------------------------------------------------------------------------------------------------------------------
    Road Snow Course		3	 	 11/94	  Weekly	Spot	Depths noted from road
    Reference Stand #4		3		  1/78	  Monthly	Spot	Snow Course Midslope, forest
    Reference Stand #4 Open		3		  1/78	  Monthly	Spot	Snow Course Road
    Reference Stand #13		3		  2/78	  Monthly	Spot	Snow Course Midslope, Wildcat Mtn RNA        
    Reference Stand #13 Open	3		  2/78	  Monthly	Spot	Snow Course Midslope, Wildcat Mtn RNA Meadow 
    Reference Stand #14		3		  1/78	  Monthly	Spot	Snow Course Midslope, Wildcat Mtn RNA        
    Reference Stand #14 Open	3		 12/84	  Monthly	Spot	Snow Course Midslope, Wildcat Mtn RNA Open
    ______________________________________________________________________________________________
    
    

    Table 6. Other Meteorological Variables Currently Measured, 1995

    
    RELATIVE HUMIDITY
      
    Site Name		 	Tier	  Begin	  Begin	  Finest	Method	Comments
    					  Daily	Fine Res  Resolution	 
    					 (mm/yy) (mm/yy)
    ______________________________________________________________________________________________
    Central Met Station		1	   NA	   NA	   NA		CR10	Planned installation for summer, 1995
    Primary Met Station 		1	  7/88	  7/88	  Hourly	CR21X	Sensor at 150 cm
    Upper Lookout Met Statn		1	 10/94	 10/94	  Hourly	CR10	Sensor at 450 cm, 150 cm planned
    Vanilla Leaf Met Station	1	  6/87	 10/90	  Hourly	CR21X	Sensor at 450 cm, 150 cm planned
    -----------------------------------------------------------------------------------------------------------------------------------------
    Hi-15 Met Station      		2	  3/92	  3/92	  Hourly	CR10	Sensors at 150, 450 cm
    WS#2 Climatic Station 		2	  2/58	  	  Daily		Chart	Max-min only, sensor at 130 cm
    -----------------------------------------------------------------------------------------------------------------------------------------
    
    
    
    VAPOR PRESSURE DEFICIT
      
    Site Name		 	Tier	  Begin	  Begin	  Finest	Method	Comments
    					  Daily	Fine Res  Resolution	 
    					(mm/yy)	(mm/yy)                                                
    ______________________________________________________________________________________________
    Central Met Station		1	   NA	   NA	   NA		CR10	Planned installation for summer, 1995
    Primary Met Station 		1	  7/88	  7/88	  Hourly	CR21X	Calculated every 15 sec from temp, rh
    Upper Lookout Met Statn		1	 10/94	 10/94	  Hourly	CR10	Calculated every 15 sec from temp, rh
    Vanilla Leaf Met Station	1	 10/94	 10/94	  Hourly	CR21X	Calculated every 15 sec from temp, rh
    ______________________________________________________________________________________________
    
    
    
    
    SOIL MOISTURE
      
    Site Name		 	Tier	  Begin	  Begin	  Finest	Method	Comments
    					  Daily	Fine Res  Resolution	 
    					(mm/yy)	(mm/yy)
    ______________________________________________________________________________________________
    Central Met Station		1	   NA	   NA	   NA		CR10	Planned installation for summer, 1995
    Primary Met Station 		1	 11/94	 	  Daily		CR21X	1987-90 data, restarted at 10,20,50,100 cm depth
    Upper Lookout Met Statn		1	 10/94	 	  Daily		CR10	Depths: 10,20,50,100 cm 
    Vanilla Leaf Met Station	1	  6/87	 	  Daily		CR21X	Hourly data 1990-94, depths:10,20,50,100 cm 
    ______________________________________________________________________________________________
    
    
    
    SOLAR RADIATION
      
    Site Name		 	Tier	  Begin	  Begin	  Finest	Method	Comments
    					  Daily	Fine Res  Resolution	 
    					(mm/yy)	(mm/yy)
    ______________________________________________________________________________________________
    Central Met Station		1	   NA	   NA	   NA		CR10	Planned installation for summer, 1995
    Primary Met Station 		1	  5/72	  5/72	  Hourly	CR21X	Much estimation of data in 1970's
    Upper Lookout Met Statn		1	 10/94	 10/94	  15 minute	CR10	
    Vanilla Leaf Met Station	1	  6/87	 10/90	  15 minute	CR21X	Hourly until 10/94
    ______________________________________________________________________________________________
    
      
    
    WIND DIRECTION
      
    Site Name		 	Tier	  Begin	  Begin	  Finest	Method	Comments
    					  Daily	Fine Res  Resolution	 
    					(mm/yy)	(mm/yy)
    ______________________________________________________________________________________________
    Central Met Station		1	   NA	   NA	   NA		CR10	Planned installation for summer, 1995
    Primary Met Station 		1	  7/88	 11/94	  Hourly	CR21X	Resultant vector, daily wind rose, std dev
    Upper Lookout Met Statn		1	 10/94	 10/94	  Hourly	CR10	Resultant vector, daily wind rose, std dev
    Vanilla Leaf Met Station	1	  6/87	 10/94	  Hourly	CR21X	Resultant vector, daily wind rose, std dev
    -----------------------------------------------------------------------------------------------------------------------------------------
    Hi-15 Met Station      		2	  3/92	  3/92	  Hourly	CR10	Resultant vector, daily wind rose, std dev
    ______________________________________________________________________________________________
    
    
    
    WIND SPEED
      
    Site Name		 	Tier	  Begin	  Begin	  Finest	Method	Comments
    					  Daily	Fine Res  Resolution	 
    					(mm/yy)	(mm/yy)
    ______________________________________________________________________________________________
    Central Met Station		1	   NA	   NA	   NA		CR10	Planned installation for summer, 1995
    Primary Met Station 		1	  5/73    5/73	  Hourly	CR21X	After 7/88 max wind, resultant magnitude
    Upper Lookout Met Statn		1	 10/94	 10/94	  Hourly	CR10	Wind speed, max wind, resultant magnitude
    Vanilla Leaf Met Station	1	  6/87	 10/90	  Hourly	CR21X	Wind speed, max wind, resultant magnitude
    -----------------------------------------------------------------------------------------------------------------------------------------
    Hi-15 Met Station      		2	  3/92	  3/92	  Hourly	CR10	Wind speed, max wind, resultant magnitude
    ______________________________________________________________________________________________
    
    
    
    
    

    Table 7. Proposed variables for measurement and their temporal resolution at the benchmark and second level stations.

    
     Variables               Temporal Resolution      Remarks
    -------------------------------------------------------------------------------
     Air temperature         15 min                   Heights of 1.5, 2.5, 3.5,
     4 heights               Hourly**                 and 4.5 meters
    
     Precipitation           5 min                    Two approaches have been 
                                                      implemented at BMS sites
    
     Solar radiation         15 min                   Incoming shortwave
    
     Photosynthetically      15 min                   Primary Met only
     active radiation (PAR) *
    
    Relative humidity        Hourly                   Move to 4.5 meters during 
                                                      winter at high elevation 
    
    Dew point temperature    Hourly                   Continuously calculated
    
    Vapor pressure deficit   Hourly                   Continuously calculated
    
    Wind speed               Hourly
    
    Wind direction           Hourly                   Wind rose vectors summed
                             Daily wind rose          daily
    
    Snow pillow              5 minute                 Instantaneous snow moisture
    
    Snow melt lysimeter      5 minute                 Not at Primary Met
    
    Soil temperature         Hourly                   Depths of 10, 20, 50,
    4 depths                                          and 100 cm
    
    Soil moisture            Daily                    Depths of 10, 20, 50,
    4 depths                                          and 100 cm
    
    Streamflow               15 min                   Finest resolution of 5 min
                                                      in selected storms
    
    Stream temperature       Hourly                   Mack Gaging Station, and 
                                                      second level sites
    
    Pan evaporation *        Daily                    Primary Met only
    
    Sunshine duration *      Daily                    Primary Met only, might 
                                                      calculate
    ------------------------------------------------------------------------------
    * Proposed new variable
    ** Second level stations only